Skip to content
AWS · Migration · Modernization · Operations

Move critical workloads to AWS with a route you can defend.

We turn the current landscape into an executable plan: what to move, what to modernize, in what order, at what cost, with what risk, and how to operate it afterward. For SAP and enterprise workloads.

A complete service

From the first evidence to stable operations

We activate only the modules the case needs. Scope can begin with an assessment, a specific migration, or operation of an existing platform.

Assessment and business case

We inventory workloads, dependencies, versions, consumption, criticality, windows, and cost to build a wave-based route.

Inventory · dependencies · TCO · waves

Landing zone and connectivity

We design accounts, networking, identity, encryption, logging, policies, and environment separation before moving the first workload.

Identity · network · governance · security

Migration factory

We execute repeatable waves with testing, entry and exit criteria, cutover, rollback, and documented stabilization.

Pilot · waves · cutover · hypercare

SAP on AWS

We prepare and migrate SAP landscapes considering HANA, Basis, interfaces, high availability, backups, and business continuity.

SAP · HANA · Basis · continuity

Application modernization

We reshape components where value exists: containers, managed services, serverless, APIs, and deployment automation.

Containers · serverless · APIs · CI/CD

Data and analytics

We move and modernize databases, integration, storage, and analytics while preserving quality, lineage, access, and traceability.

Databases · lake · integration · BI

Resilience and recovery

We design backup, recovery, failover, and continuity testing with objectives defined by each process's criticality.

RTO · RPO · backup · disaster recovery

Managed operations and FinOps

We operate capacity, patching, observability, incidents, security, and cost with owners, dashboards, and optimization cycles.

Monitoring · SLA · cost · optimization

Reference architecture

It is not about moving servers. It is about building an operable system.

The architecture connects source, AWS foundation, execution, and control. Each block has an owner, acceptance criteria, and evidence before moving forward.

Architecture decision

Each service is included for a verifiable reason: continuity, security, performance, delivery speed, or total cost.

Source01

Current landscape

  • SAP and HANA
  • Applications
  • Data and interfaces
Foundation02

AWS Landing Zone

  • Identity and accounts
  • Network and security
  • Logging and governance
Execution03

Migrate and modernize

  • Waves and testing
  • Data and applications
  • Cutover and rollback
Control04

Operate and optimize

  • Observability
  • Continuity and SLA
  • FinOps

Workload path

Not everything migrates the same way

The decision is made with business and technical evidence. This avoids modernizing for fashion or moving debt without understanding it.

01

Rehost

We move the workload with minimal change when the priority is leaving current infrastructure with controlled risk.

02

Replatform

We adjust specific components to use managed services without redesigning the entire application.

03

Refactor

We redesign where scalability, resilience, or speed of change justifies a new architecture.

04

Retain or retire

We temporarily retain what should not move yet and retire low-value assets so unnecessary cost is not migrated.

Phased execution

Five decisions, one traceability chain

Each phase ends with a reviewable outcome before the next is authorized.

01

Discover

Landscape, dependencies, criticality, consumption, and constraints.

Trusted baseline

02

Decide

Path per workload, target architecture, TCO, risks, and sequence.

Business case

03

Prepare

Landing zone, connectivity, security, automation, and pilot.

Migration-ready foundation

04

Migrate

Waves, rehearsals, cutover, rollback, validation, and evidence.

Stabilized workloads

05

Operate

Observability, SLA, capacity, security, cost, and continuous improvement.

Governed operations

What the client receives

Deliverables for decision, execution, and operations

Migration does not end when a workload is running. It ends when evidence, support, cost visibility, and an operations-ready team exist.

Documented decision
Verifiable control
Observable operations
Governed cost
  • 01Application, infrastructure, and dependency inventory validated with owners.
  • 02Workload decision matrix and wave plan with prioritization criteria.
  • 03Target architecture and landing zone documented per environment.
  • 04Current and target cost model, assumptions, budgets, and alarms.
  • 05Testing, cutover, rollback, continuity, and stabilization plan.
  • 06Infrastructure as code, deployment automation, and technical controls.
  • 07Health, performance, security, capacity, and spend dashboards.
  • 08Runbooks, support model, owners, SLA, and knowledge transfer.

The first step can be small

We can begin with an assessment scoped to one landscape, a critical application, or a data platform. The result must make it clear whether to migrate, modernize, retain, or retire.

Define the assessment

Your next version

What should move first in your operation?

Let us turn that answer into a focused diagnosis, a first deliverable, and a path to scale.

01Problem and context

02Scope and first evidence

03Evolution path